<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-11-22T13:18:54Z</responseDate><request verb="GetRecord" identifier="oai:uwspace.uwaterloo.ca:10012/3454" metadataPrefix="dim">https://dspacemainprd01.lib.uwaterloo.ca/server/oai/request</request><GetRecord><record><header><identifier>oai:uwspace.uwaterloo.ca:10012/3454</identifier><datestamp>2017-03-21T16:25:56Z</datestamp><setSpec>com_10012_9900</setSpec><setSpec>com_10012_1</setSpec><setSpec>col_10012_9908</setSpec><setSpec>col_10012_6</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:doc="http://www.lyncode.com/xoai" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="author" authority="b8b3f5a5-9548-4be6-8a8c-c68e428f1e88" confidence="600">Alvarez Lopez, Juan</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2007-12-21T15:06:12Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2007-12-21T15:06:12Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued">2007-12-21T15:06:12Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="submitted">2007</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/10012/3454</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en">Centralized power system planning covers time windows that range&#xd;
from ten to thirty years. Consequently, it is the longest and most&#xd;
uncertain part of power system economics. One of the challenges that&#xd;
power system planning faces is the inability to accurately predict&#xd;
random events; these random events introduce risk in the planning&#xd;
process. Another challenge stems from the fact that, despite having&#xd;
a centralized planning scheme, generation plans are set first and&#xd;
then transmission expansion plans are carried out. This thesis&#xd;
addresses these problems. A joint model for generation and&#xd;
transmission expansion for the vertically integrated industry is&#xd;
proposed. Randomness is considered in demand, equivalent&#xd;
availability factors of the generators, and transmission capacity&#xd;
factors of the transmission lines. The system expansion model is&#xd;
formulated as a two-stage stochastic program with fixed recourse and&#xd;
probabilistic constraints. The transmission network is included via&#xd;
a DC approximation. The mean variance Markowitz theory is used as a&#xd;
risk minimization technique in order to minimize the variance of the&#xd;
annualized estimated generating cost. This system expansion model is&#xd;
capable of considering the locations of new generation and&#xd;
transmission and also of choosing the right mixture of generating&#xd;
technologies.&#xd;
&#xd;
The global tendency is to move from regulated power systems to&#xd;
deregulated power systems. Power pool electricity markets, assuming&#xd;
that the independent system operator is concerned with the social&#xd;
cost minimization, face great uncertainties from supply and demand&#xd;
bids submitted by market participants. In power pool electricity&#xd;
markets, randomness in the cost and benefit functions through random&#xd;
demand and supply functions has never been considered before. This&#xd;
thesis considers as random all the coefficients of the quadratic&#xd;
cost and benefit functions and uses the mean variance Markowitz&#xd;
theory to minimize the social cost variance. The impacts that this&#xd;
risk minimization technique has on nodal prices and on the&#xd;
elasticities of the supply and demand curves are studied.&#xd;
&#xd;
All the mathematical models in this thesis are exemplified by the&#xd;
six-node network proposed by Garver in 1970, by the 21-node network&#xd;
proposed by the IEEE Reliability Test System Task Force in 1979, and&#xd;
by the IEEE 57- and 118-node systems.</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso" lang="en">en</dim:field>
   <dim:field mdschema="dc" element="publisher" lang="en">University of Waterloo</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en">Power System Planning</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en">Risk Minimization</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en">Mean-Variance Markowitz Theory</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en">Random Supply Curves</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en">Random Demand Curves</dim:field>
   <dim:field mdschema="dc" element="subject" qualifier="program" lang="en">Electrical and Computer Engineering</dim:field>
   <dim:field mdschema="dc" element="title" lang="en">Risk Minimization in Power System Expansion and Power Pool Electricity Markets</dim:field>
   <dim:field mdschema="dc" element="type" lang="en">Doctoral Thesis</dim:field>
   <dim:field mdschema="dc" element="pending" lang="en">false</dim:field>
   <dim:field mdschema="uws-etd" element="degree" qualifier="department" lang="en">Electrical and Computer Engineering</dim:field>
   <dim:field mdschema="uws-etd" element="degree" lang="en">Doctor of Philosophy</dim:field>
   <dim:field mdschema="uws" element="typeOfResource" lang="en">Text</dim:field>
   <dim:field mdschema="uws" element="peerReviewStatus" lang="en">Unreviewed</dim:field>
   <dim:field mdschema="uws" element="scholarLevel" lang="en">Graduate</dim:field>
   <dim:field mdschema="others" element="access-status">open.access</dim:field>
</dim:dim>
</metadata></record></GetRecord></OAI-PMH>